You don't have javascript enabled. Good luck with that.
Pencarian
UKT 2 Lakukan Perawatan Lampu PJU di Delapan Pulau Permukiman

Streetlights in 8 Residential Islands Repaired

Thousand Islands Technical Work Unit (UKT) 2 has repaired streetlights (PJUs) in 8 residential islands, both in North Thousand Islands and South Thousand Islands Sub-districts.

Previously we used 150 watts for PJU, but now we replace it with 40-90 watts LED

Thousand Islands UKT 2 Head, Sofyan mentioned, his side repaired broken PJUs, both in residential areas and pier.

"Previously we used 150 watts for PJU, but now we replace it with 40-90 watts LED because it is brighter and more efficient. We also repair damaged ornaments on PJUs. In total, we repair PJUs in 50 points in 8 residential islands," he explained, Thursday (3/18).

Seven Street Lights in Taman Sari Repaired

In detail, personnel repair and replace PJUs in Tidung Island, Untung Jawa Island, Lancang Island, Pramuka Island, Panggang Island, Harapan Island, Sebira Island, and Kelapa Island.

"Gradually, we will carry out efficiency of electrical power by replacing PJUs bulbs into LED in 11 residential islands. Currently, we focus on replacing broken and dead PJUs," he stated.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye869 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye424 personFakhrizal Fakhri
  3. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye371 personDessy Suciati
  4. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye359 personDessy Suciati
  5. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye358 personAldi Geri Lumban Tobing
close